Mt Barker Sports Hub

ProjectMt Barker Sports Hub
Duration3 Months
LocationMt Barker, SA
Sector
Services
Bulk Earthworks

SCOPE OF WORKS

  • Cut/fill 88,000m3 level 1
  • Playing ground
  • Buildings
  • Roads
  • Carparks
  • Strip and stockpile top soil
  • Respread topsoil
  • Cut to fill – AS 3798 – Level One
  • Cut to spoil on site
  • Cut drainage swales
  • As- constructed survey